Fabrication quote checklist: 12 things every estimate should state
Most disputes over fabrication work start with a quote that did not say what it covered. Whether you quote a tank, a pipe spool or a steel frame, a clear estimate protects both the shop and the client. Use this checklist before you send one.
The design basis
Which drawings, datasheet and revision the quote is based on, and who is responsible for the design. If the design is by others, say so.
Codes and standards
The design code (for example API 650 or AS 1692 for tanks, ASME B31.3 for process piping) and the fabrication and testing standards that apply.
Materials
Grades, schedules or thicknesses, and whether certificates (for example EN 10204 3.1) are included.
Quantities
A material take-off, weights and the number of welds or items, so the client can compare quotes like for like.
Man-hours by activity
Cutting, fitting, welding, NDT, testing, finishing and engineering shown separately, not one lump sum.
NDT and testing
Methods and percentages, the test pressure and medium, and who witnesses.
Surface finish
Blasting and paint system, pickling and passivation, or polish grade for hygienic service.
Exclusions
Everything not in the price, in a list the client cannot miss: GST, transport, site work, vendor items such as agitators and instruments, foundations, permits.
Delivery terms
Ex-works at the shop, or delivered to site, and who unloads.
Duration
Drawing approval, procurement, fabrication and testing, finishing and dispatch, from the order date.
Contingency and markup
Kept separate: contingency for what is not yet known, markup as the commercial margin. State whether the price includes them.
Validity and revisions
How long the price holds, given steel price movements, and how a changed datasheet will be re-priced.
Make it traceable
A client trusts a number they can follow. If each figure in the quote leads back to a quantity, a rate and a rule, questions are answered in minutes instead of meetings. A report number and a way to check that the document is genuine help too, especially when quotes are forwarded between companies.
Every Estineer report covers this list. The tools produce the design basis, quantities, man-hours by activity, NDT, exclusions, duration, contingency and markup in one report, with a report number and a check code anyone can verify. See a sample report.