Pipeline spool fabrication estimate · whole line to shop spools

Connecting
Project
Spool breaks

Put a Break card in Components wherever you want the line split. A Valve card also splits the line, with a flange on each side.

Line data
Components

Flanges, pipes, elbows, reducers and branches are listed in fabrication order in the Components tab.

Finish and test
NDT, % of shop welds (empty = default)
MethodButt weldsSocket, slip-on, branch
RT-
UT-
MT
PT

RT radiography · UT ultrasonic · MT magnetic particle (carbon steels) · PT dye penetrant. The tool picks the welds (largest and thickest first). To choose them yourself, tick the methods per weld in the Welds tab.

Design by others. NDT, test pressure and heat treatment follow the client specification; the tool suggests defaults.

Subcontract quotes

Tick a scope that a subcontractor does: its in-house hours and materials are taken out. Enter the quote to add it to the price; leave it empty to list it under "The price excludes".

Workshop rates

Pipe spool

Example inputs · engine loading
Direct cost
—
material + labour
Indicative price
—
with markup
Man-hours
—
eng · shop · NDT · test
Duration
—
from order
Drag to rotate · scroll or pinch to zoom · right-drag to pan · click a part to select it. Grey: pipe and fittings · blue: flanges · orange: shop welds · red: welds selected for radiography · dark red: field welds. Compass: N, E, S, W and Up as the model turns; Reset view goes back to the iso view.
Starting the engineering engineThe engineering engine on the Estineer server is working out your line.

Questions about the pipeline spool tool

How is the line split into spools?

At every Break card you place, at every valve (a Valve card puts a flange on each side), and automatically wherever a spool would not fit the truck envelope of 12 × 2.4 × 2.6 m. Each break can be a field weld with bevelled ends or a weld-neck flange pair.

Is each spool estimated separately?

Yes. Every spool is estimated as its own shop order, with its own report, isometric, weld record and cut list. The line summary adds the field joints, the valves between spools, the site bolting materials and the line's project management and QA/QC.

How much does a pipeline package cost?

A$99 for the first spool and A$49 for each further spool, at most A$1,490 for a line of up to 30 spools, GST included. The first report is 80% off. The preview, with the whole line in 3D and the spool list, is free and needs no sign-up.

How long does a package take?

A few minutes for a short line, up to about 20 minutes for 30 spools. We email you when the files are ready, and they are kept on your account for 12 months.

Can I change the line after buying?

Yes, once, within 24 hours, as Rev B. If the revision adds spools, only the list-price difference is paid; the same or fewer spools is free.